BILL C-38
An Act to permit the resumption and continuation of the operation of the National Research Universal Reactor at Chalk River

AS PASSED
BY THE HOUSE OF COMMONS
DECEMBER 11, 2007

90448

SUMMARY
This enactment permits Atomic Energy of Canada Limited to resume and continue the operation of the National Research Universal Reactor at Chalk River in Ontario for a period of 120 days despite certain conditions of its licence under the Nuclear Safety and Control Act.

Also available on the Parliament of Canada Web Site at the following address:
http://www.parl.gc.ca

2nd Session, 39th Parliament,
56 Elizabeth II, 2007
house of commons of canada
BILL C-38
An Act to permit the resumption and continuation of the operation of the National Research Universal Reactor at Chalk River
Preamble
Whereas Atomic Energy of Canada Limited is the operator of the National Research Universal Reactor at Chalk River, a reactor that is the major producer of medical isotopes in Canada;
Whereas that reactor has been shut down for maintenance purposes and Atomic Energy of Canada Limited is prohibited from resuming the operation of the reactor until conditions of its licence relating to earthquake-proof backup units have been complied with;
And whereas the shutdown has created a serious shortage of medical isotopes in Canada and around the world and is putting the health of Canadians at risk;
Now, therefore, Her Majesty, by and with the advice and consent of the Senate and House of Commons of Canada, enacts as follows:
Permission to resume and continue operation
1. (1) Atomic Energy of Canada Limited may resume and continue the operation of the National Research Universal Reactor at Chalk River in Ontario for a period of 120 days after the coming into force of this Act despite any conditions of its licence under the Nuclear Safety and Control Act relating to the installation of seismically qualified motor starters on the heavy water pumps and the connection to the emergency power supply.
Safety considerations
(2) Atomic Energy of Canada Limited may resume and continue the operation of the National Research Universal Reactor at Chalk River only if it is satisfied that it is safe to do so.
Authority of the Canadian Nuclear Safety Commission
2. For greater certainty, nothing in this Act derogates from the authority of the Canadian Nuclear Safety Commission in respect of Atomic Energy of Canada Limited, except for the specific licence conditions mentioned in subsection 1(1).